SEAI Retrofit Grants 2026
Claim Up to €10,000 in Ireland
Claim Up to €10,000 in Ireland

The Sustainable Energy Authority of Ireland (SEAI) operates several schemes. The headline numbers most homeowners see come from the Better Energy Homes Scheme and the One Stop Shop Scheme. The table below shows indicative grant values; confirm exact current rates on seai.ie before applying.
| Measure | Indicative Grant |
|---|---|
| Attic insulation | €800-€1,500 |
| Cavity wall insulation | €700-€1,700 |
| External wall insulation | €3,000-€8,000 |
| Internal wall (dry-lining) | €1,500-€4,500 |
| Air-to-water heat pump | €6,500 |
| Solar PV (up to 2kWp) | €1,800 |
| Heating controls | €700 |
| BER assessment (post-works) | €50 |
Quoted prices vary by region, house size and contractor availability. Confirm every figure directly with SEAI before committing to works.
For most insulation grants, the property must have been built and occupied before 2011. For the heat pump grant, the cut-off is 2021. The works must be carried out by a contractor on the SEAI registered list. Self-installation, even by a qualified tradesperson, will not be grant-aided.
Two rules commonly catch homeowners out:
Roof replacement itself is not grant-aided by SEAI. Slates, tiles, felt, battens and flashings are categorised as structural maintenance, not energy upgrades.
However, attic insulation is grant-aided, and the condition of the roof above it directly determines whether that insulation will perform. Pumping insulation into an attic with slipped slates, perished felt or failed flashings risks damp insulation and compressed fibres within a few winters. Grant-funded insulation installed beneath a failing roof is money wasted.
The sensible sequence for any pre-2000 Irish home is:
Skipping the roof check first is the single most common mistake we see in Cork, Limerick, Dublin and Galway homes that have had grant-funded insulation installed in recent years.
SEAI's One Stop Shop scheme bundles works through a single Registered Project Coordinator who manages design, contractors, grant claims and the post-works BER. It is the route that unlocks larger grant amounts and is typically required to achieve a deep retrofit outcome. Going it alone via Better Energy Homes works well for single measures such as attic or cavity insulation, but does not require a whole-house energy outcome.
Check the full details of both routes on seai.ie before deciding which suits your property and budget.
If your roof is over 25 years old, has visible slipped or cracked slates, shows internal staining on upstairs ceilings, or has gutters that overflow in heavy rain, get it inspected before lodging any SEAI application. A roof inspection now can save you from grant-funded insulation that fails within a few years because the roof above it was already letting water in.
Recommended Roofing has carried out pre-retrofit roof inspections and repairs across Cork, Dublin, Limerick and Galway. You can see examples of recent work in our project gallery and read customer accounts on our reviews page. For further reading, our guide on attic insulation and roof ventilation in Cork covers the interaction between roof condition and insulation performance in more detail.
To request a free roof inspection before your retrofit, visit our contact page or call the number for your area: Dublin 01 2657795, Cork 021 2040925, Limerick 061 788600 or Galway 091 622895.
No. SEAI grants do not cover roof replacement, re-slating, re-tiling, felt renewal or structural roof works. These are classed as maintenance rather than energy upgrades. However, attic insulation installed after a roof has been made watertight is grant-aided.
Most homeowners doing a phased retrofit claim multiple grants across different measures. Confirm the current combined maximums directly with SEAI at seai.ie, as the figures depend on the measures chosen and the scheme you apply through.
Payment and reimbursement arrangements differ between the Better Energy Homes Scheme and the One Stop Shop. Check the exact process for each scheme on seai.ie before you apply.
The roof, always. Insulation installed beneath a roof that fails within a few years will need to be ripped out and replaced, and SEAI grants cannot be claimed twice on the same measure at the same property.
Eligibility rules vary by scheme and measure. Check the current eligibility criteria on seai.ie before applying.
Most insulation grants require the home to have been built before 2011. The heat pump grant applies to homes built before 2021. Check seai.ie for the current eligibility rules for any measure you are considering.
A post-works BER by an independent assessor is mandatory for most SEAI-funded measures. The assessor must be independent of the contractor who carried out the works.
No. Self-installation is not grant-aided, even if carried out by a qualified tradesperson. Works must be done by a contractor on the SEAI registered list.
The One Stop Shop scheme co-ordinates design, contractors, grant claims and the post-works BER through a single Registered Project Coordinator. It is the route for homeowners planning a deep retrofit across multiple measures. Better Energy Homes works well for single measures. SEAI's website explains both in detail.
Yes. We carry out pre-retrofit roof inspections in Cork, Dublin, Limerick and Galway. We will tell you honestly whether the roof needs work before insulation goes in, or whether it is good for another decade. Quotes are free.
Slipped or cracked slates, perished underlay, failed flashings, blocked or overflowing gutters and end-of-life ridge mortar can all allow water into the roof space. Any of these problems will cause damp insulation and reduce its performance, so they should be resolved before insulation is installed.
No. We carry out the roof repairs and inspections that prepare a home for insulation. For the SEAI-funded insulation itself, you need a contractor registered with SEAI for the relevant measure.
Roof Repairs in Ireland. Free survey, written fixed-price quote, 10-year guarantee.